To connect power, configure an ztC Edge system licensed for two nodes with redundant power supplies connected to separate sources. You can optionally use uninterruptible power supplies (UPS), as shown below.
After connecting power, return to Deploying the System.
The illustrations show how to connect one or two optional UPS units to an ztC Edge system licensed for two nodes.