Connecting Power
To connect power, configure an ztC Edge system licensed for two nodes with redundant power supplies connected to separate sources. You can optionally use uninterruptible power supplies (UPS), as shown below. For an illustration of how to connect the one node of a single-node system to a UPS, see the node0 connections under Dual UPS.
After connecting power, return to Deploying the System.
UPS (Optional)
The illustrations show how to connect one or two optional UPS units to an ztC Edge system licensed for two nodes.
Note: Stratus recommends that you use two UPS units connected to separate and independent power sources. With two power sources, the system continues to receive power in the event that one power source fails.
Single UPS:
Dual UPS: