Maintaining Physical Machines

You can maintain physical machines (PMs), or nodes, in a ztC Edge system by replacing or recovering them.

To replace a failed PM, use one of the following procedures:

To recover the system software on a failed PM instead of replacing the PM hardware, see Recovering a Failed Physical Machine (Manual).

To add a node to a system licensed for one node, see Adding a Node to a Single-Node System.